Initial evaluation on item structure, access limits, timing needs, and environmental factors.
Strategic preparation with task-specific materials, load planning, and sequences.
Proper extraction from the location using clearance mapping and surface protection.
Secured transport with placement logic that limits motion, pressure transfer, and exposure.
Final positioning, verification, and post-move review to confirm condition and alignment.